Terry and Michael Academy status, December 31, 2022 update


Wishing all a very Happy New Year and a healthy, prosperous and learning-filled 2023!

Here is where we stand w/ the Liberia School, “Terry and Michael Academy”

JANUARY-FEBRUARY 2023

  • Foundation for new school house completed (funded Dec 12, 2022)
  • Fundraising for completion of the structure continues
  • Once completed, 100-200+ students may be able to attend the school

SPRING 2023 GOALS

  • School house furniture and supplies, t.b.a.
  • Playground ($3,850)
  • Satellite broadband connectivity ($200-400 / month)
    • especially important for continued teacher training
    • commencement of peer-to-peer teacher mentoring with U.S. educators
    • video-conference teaching of students by U.S. educators
    • student peer-to-peer mentoring

TIMELINE OF LIBRARY AND SCHOOL PROJECT (2021-2022)

SEPTEMBER-OCTOBER 2021

  • Container placed on location at. St. Martin of Tours School, Gaithersburg, Maryland
  • LexisNexis & St. Martin of Tours school volunteers help load and paint the container
  • Container fully loaded & closed, October 12
  • Container moved to port on October 18
  • Loaded on cargo ship late October

NOVEMBER-DECEMBER 2021

  • Container arrival to Monrovia early December
  • Excessive delays at port due to difficulties with shipping agent & customs
  • Container released just before Christmas, 2021

JANUARY 2022

  • School4Schools Foundation conducts teacher training sessions w/ local teachers in Lower Johnsonville

MAY-JUNE 2022

  • Container moved to Lower Johnsonville, Liberia
    • Timing for the move depended upon arrival of rainy season, as local roads are not passable by a heavy truck in dry season due to sand
    • Transit had to be completed just as the rains started so that the sandy roads would harden in the first rains and before they loosened in subsequent rains
  • Terry visit to site in Liberia
    • Residents ask if the container can be used as a school as well as a library
  • School4Schools Foundation continues teacher training sessions

JULY-AUGUST 2022

  • Sonnie Lawrence and her team commence preparations for the opening of a school
  • Sonnie identifies specific needs for fundraising:
    • perimeter fence
    • roof for container
    • permanent foundation for container
    • flagpole
    • playground & sports equipment
    • 4K projector & other classroom supplies
  • August 18: School4Schools Foundation helps sponsor a field trip for area students, their very first

SEPTEMBER-OCTOBER 2022

  • The Terry and Michael Academy opens in mid-September with five paying students
  • Additional students are quickly taken on with tuition covered in exchange for parent volunteering / help to build out the school site
  • Enrollment limited to 52 students due to space limitations
    • an additional 60-75 students added to wait list
  • School4Schools commences fundraising campaign and sends first round of donations for
    • container roof ($1500)
    • perimeter fence ($1400)
    • 4K projector & supplies ($650)

NOVEMBER-DECEMBER 2022

  • New school house design and budget identifed, approx. $7500
  • Donors fund commencement of project
    • $3,150 send for construction of building foundation
  • First semester ends with 50 students:
    • 30 had never attended a school before
    • 15 had only attended school part time
    • only 5 had ever attended a regular school
  • December 19: ground-breaking ceremony held at the school for the new building.